Friday 12 November 2010

Install.. second layer




















The tree piece laid out on the atrium floor, this is the most difficult piecing to get right, afew mm out at an angle, throws all the other panels out. All the other panels are placed in a linear format.
















Started with the third panel along, it had a defined matchup line. Here's where the scaffolding comes into use.
















Dean and Keith half way along, on the two hills...

No comments:

Post a Comment